Warsop Main Colliery From Opening To Closure (1889-1989)(Part 01)

   

013-The Mixed Pressure Turbine driving the 1200Kw Alternator in the Power House at Warsop Main Colliery. This turbine was designed to run on live steam directly from the Boilers when the Winding Engines were stood and exhaust steam when the Winding Engines were working.

Image | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | > | »
Total images: 61 | Last update: 02/09/08 10:56 | Generated by JAlbum 7.2 & Chameleon | Help